Market: Legacy/Conversion

Semiconductor Manufacturing

Over the past two decades CPS has designed and installed hundreds of HVAC and facility control systems for critical GMP and cleanroom manufacturing areas.  Projects have included energy recovery,...

PLC Upgrade – Tank Farm Automation

Switching 1300 IO points over to a new PLC system in less than 4 hours.  CPS did that. Having the new software installed and operational in 2 days.  CPS did that. With 1500 possible flow paths...